|
The latest version was deployed on February 29, 2012.
- Menus are now displayed in a way to make the tool easier to navigate.
Instead of menu items across the top, some of the menu items are in drop down lists.
- The downloadable files are now more prominent and include descriptions of
the files.
They are accessible on a drop down menu under calculate summary.
- The Summary page now shows the total load for a scenario from land use
loads, septic
systems and waste water loads at the very top.
- The Compare page now shows the percent difference between scenarios for
land use
septic, and waste water loads.
- A BMP Score calculation has been added to the Summary and Compare pages.
The BMP
scores are provided to allow comparison among scenarios without comparing actual
loads. The calculation of these scores are based on acres of BMPs implemented and
weighted by the effectiveness value and unit area load for those BMPs with land
use changes. The scores are normalized by the Phase 1 WIP scenario in VAST and summarized
by land use.
|